I have used ACAD2002 in the past and I always liked the fact that I could have as many drawings open as I wanted. Is this possible with R14? Is there a setting I need to change or was this a new feature on 2000? Also, is it possible to "copy with a base point" in R14 so I can have info in my clipboard for multiple pastings? James