Newbie: Plan to Elevation

Status
Not open for further replies.

Art M

Usenet Archive
Joined
Jan 5, 2002
Messages
5
Reaction score
0
I'd like to make an elevation based on the plan I've already made. Should I put it in a new layer and start with it over the existing plan?... Do you know of any web tutorials that cover this?

Thanks for any help,
--Art

BTW what's the difference between this group and alt.cad.autocad?
 
That's how we do it. If you place your elevations off to the sides of your floor plans, you then have the advantage (just as in conventional pencil and paper drafting) of being able to project the locations of corners, walls, doors, windows, etc. directly to your elevations. When we finish an architectural project, we will have all of our elevations projected out from the various sides of the plans; furthermore, all of our plan views -- foundation, main floor, second floor, roof framing, etc. occupy the same piece of drawing real estate, and are separated for viewing and plotting according to the layer "families" in which they reside. Using paper space, you can selectively display layer families, and rotate your views (elevations) as needed to lay out your various drawing sheets.

For an idea of how all this works in Paper Space, see the tutorial at http://www.turvill.com/t2/documents ___

"Art M" wrote:

I'd like to make an elevation based on the plan I've already made. Should
I
put it in a new layer and start with it over the existing plan?...
 
Thanks for the description and the link. Both were very helpful.

--Art

Paul Turvill wrote:

That's how we do it. If you place your elevations off to the sides of your floor plans, you then have the advantage (just as in conventional pencil
and
paper drafting) of being able to project the locations of corners, walls, doors, windows, etc. directly to your elevations. When we finish an architectural project, we will have all of our elevations projected out
from
the various sides of the plans; furthermore, all of our plan views -- foundation, main floor, second floor, roof framing, etc. occupy the same piece of drawing real estate, and are separated for viewing and plotting according to the layer "families" in which they reside. Using paper space, you can selectively display layer families, and rotate your views (elevations) as needed to lay out your various drawing sheets.

For an idea of how all this works in Paper Space, see the tutorial at http://www.turvill.com/t2/documents ___

"Art M" wrote:
...
Should
I
> put it in a new layer and start with it over the existing plan?...
 
Paul - I also layout plans and elevations the same way as your office. A great method. I'm surprised more offices don't use it. Paper space and the layout tabs introduced with r2000 are what really makes this possible. I did the same in r14 but really hogged my memory. "Layout" tabs alone made that upgrade worthwhile.

Last project I even tried laying out my wall sections over the corners of the appropriate elevations with - in my opinion - mixed results. Previously I had been doing all my wall sections cut around a building in one computer file separate from the plans and elevations. Putting them all in one computer file along with plans and elevations means one really had to organize the layer system and coordinate it with the viewports since plans and elevations are at a small scale and wall sections at a larger scale. I'll probably try it again a few more times before I decide which is easier for drawing wall sections - same computer file or a different computer file.

How does your office handle wall section drawings?
 
Our sections overlay the various areas occupied by the elevations, since they're governed by essentially the same geometry. Plotting to several different scales doesn't present any problem, since the notation and dimensions go into the appropriate layer family at the appropriate sizes for the eventual plot layouts, which are set up in PS by enabling the appropriate families of layers in each viewport.

We've been doing it this way since Paper Space was first introduced in AutoCAD (R11?). All of our sheet definitions occupy the same 24x36 area in PS, and, likewise, are separated by layer families (A1-**** for sheet A1, A2-**** for sheet A2, S1-**** for S1, etc.), with title strip data that's common to all sheets in a common layer that's on and thawed all the time. We automated sheet switching for display and plotting with AutoLISP when we first adopted the scheme, so the advent of multiple Layouts is of purely academic interest to us. We normally use a single layout even in A2K, and use our same (well, slightly modified) LISP routines still. Makes backward compatibility with R14 and earlier much easier to handle.
___
How does your office handle wall section drawings?
 
Thanks Paul - That is exactly how I handled my Wall Sections with my last project - one computer file for basically the entire project. Title blocks and certain details xref'd into the various PS layouts.

I like your idea of layer name prefix by sheet number - I hadn't thought of that. I'll have to give that some thought - especially for the wall section sheets. Most of my projects generally have between 6 and 10 architectural sheets.

Again - Thanks!
 
"Marshall E. Caudle" wrote:

Thanks Paul - That is exactly how I handled my Wall Sections with my last project - one computer file for basically the entire project.

Hi Marshall -

Sorry to jump in here so late but your comment caught my eye and I thought I'd offer a comment or three ....

I've been working in this manner for some time as well. But what I've found is that it's advantageous to break the project up into meaningful quanta which are created as separate files and xref'd into a singularity known as <dwg number/projectname/,etc.)-model.dwg. It's from the ...model.dwg that all the paperspace layouts or views are created.

Even though I work as a one-man show doing basically shop drawings of concrete structures, I find this to be helpful in segregating out the work in to manageable packages. And thinking back to the dim, dark past when running jobs in a design office drafting room using overlay drafting, it would seem that this approach would be appropriate on a team-size project as well. Although I realize, based on your earlier comments, you work basically single handedly as well.
 
Hi Dennis:

I appreciate very much you comments. I've been wrestling with the very question of how best to break up a project so that different people can work on it. Your ideas are the direction I am considering.

While I basically do all my drafting myself - Architectural and structural as well as PM&E - on my individual projects there is also another part of my architectural practice that is connected with a group of engineers that stick pretty much to designing large industrial projects - mostly just a box placed around the manufacturing process. Not many architectural features to work with on those projects unless there happens to be an associated office or research lab. Being engineers they are not interested in projects with a more architectural flair. The senior engineer (Larry) and I started the company back in 1974 and he is really reluctant to change. Took me forever to get him to use a computer and now that he can use r14 proficiently he really doesn't want to change his way of working. Everything in Model Space and so forth!

By default I am more or less the computer guru which only proves how "hard-up" and backward we really are with our CAD system. Since my projects rarely interface with theirs, I have kept my system pretty well up-to-date but theirs (hardware and software) will be seven years old in December of this year..

Right now there are four people involved with production, Larry senior, a mechanical designer and a CAD operator and Larry's son who is also a young engineer in his early thirties who will be doing this long after and Larry senior and I are gone as we are either 60 or fast approaching that number. Larry junior sees how efficient I am with CAD and he is much more inclined to change than his father. He and I have been trying to develop a method whereby the four of them can work on a project at the same time. I'm convinced that the only way would be with xref's. My only concern is that my first experience with multiple users and xrefs occurred when I worked for a year with a large firm - what a disaster the way they worked. I got involved with one set of drawings with xref's nested over 20 deep. It was not fun trying to modify a drawing. Took me forever just to find the right drawing to change. They literally xref'd everything into a drawing.

Some of our projects are quite large (400,000 sf) so we would almost have to segregate plans into packages and then xref them into a whole.

Again, appreciate very much your comments.

On Tue, 26 Feb 2002 12:21:19 -0800, Dennis Shinn
wrote:

"Marshall E. Caudle" wrote:

> Thanks Paul - That is exactly how I handled my Wall Sections with my last
> project - one computer file for basically the entire project.

Hi Marshall -

Sorry to jump in here so late but your comment caught my eye and I thought I'd offer a comment or three ....

I've been working in this manner for some time as well. But what I've found is that it's advantageous to break the project up into meaningful quanta which are ...
 
"Marshall Caudle" wrote:

<snip>
I'm convinced that the only way would
be with xref's. My only concern is that my first experience with multiple users and xrefs occurred when I worked for a year with a large firm - what a disaster the way they worked. I got involved with one set of drawings with xref's nested over 20 deep. It was not fun trying to modify a drawing. Took me forever just to find the right drawing to change. They literally xref'd everything into a drawing.

It always seems odd to me that AutoCAD didn't set the default for new Xrefs to overlay rather then xref as this would avoid all these sort of problems & there aren't really many locations when you want to have xrefs withing xrefs if you are working with large numbers of drawings. The other thing that they should have done is had a nestdepth setting (like Microstation) that would limit these things happening.

Matthew
 
Status
Not open for further replies.

Latest threads

Back
Top