Linking door block attributes to door schedule

Discussion in 'AutoCAD' started by Butler, Aug 20, 2003.

  1. Butler

    Butler Guest

    I work at an architectural firm that designs large scale building so the door schedule is rather large and takes up a lot of time to create. I want to be able to insert a door enter some attrubites and somehow link to my door schedule drawing. I up for any and all suggustions.
     
    Butler, Aug 20, 2003
    #1
  2. Butler

    Mark Propst Guest

    what is the form of the schedule?



    is it blocks with attributes or just lines and text or mtext?



    Is the schedule a different dwg file? or a block in this one?



    maybe a sample in cf would help with answers



    "Butler" <> wrote in message news:...

    I work at an architectural firm that designs large scale building so the door schedule is rather large and takes up a lot of time to create. I want to be able to insert a door enter some attrubites and somehow link to my door schedule drawing. I up for any and all suggustions.
     
    Mark Propst, Aug 20, 2003
    #2
  3. Butler

    Anne Brown Guest

    The original of this message with attached file has been moved to
    the Customer Files area at
    news://discussion.autodesk.com/autodesk.autocad.customer-files or
    http://discussion.autodesk.com/WebX?14@@.ee940b5.

    Please ZIP your files if zipping will make them smaller. Zipping
    files (if it saves space) is a courtesy to those who download the
    files.

    GIFs, JPGs, or PNGs smaller than 200k only may now be posted in
    all discussion groups.

    See the newsgroup guidelines at
    http://discussion.autodesk.com/webx?groundrules.
    --
    Anne Brown
    Manager, Moderator
    Autodesk Product Support discussion groups
    Discussion Q&A: http://www.autodesk.com/discussion

    ======================
    Subject:
    Re: Linking door block attributes to door schedule
    Date:
    Wed, 20 Aug 2003 19:07:01 -0700
    From:
    Butler <>
    Newsgroups:
    autodesk.autocad.customization.vba


    Here is a copy of the schedule, I'm not sure, I might of bite off
    more then I can chew.

    Thanks for your help,
    Brandon Butler


    File: Schedule.dwg
     
    Anne Brown, Aug 21, 2003
    #3
  4. Butler

    Anne Brown Guest

    The original of this message with attached file has been moved to
    the Customer Files area at
    news://discussion.autodesk.com/autodesk.autocad.customer-files or
    http://discussion.autodesk.com/WebX?14@@.ee940b5. Please ZIP your
    files if zipping will make them smaller. Zipping files (if it
    saves space) is a courtesy to those who download the files.

    GIFs, JPGs, or PNGs smaller than 200k only may now be posted in
    all discussion groups.

    See the newsgroup guidelines at
    http://discussion.autodesk.com/webx?groundrules.
    --
    Anne Brown
    Manager, Moderator
    Autodesk Product Support discussion groups
    Discussion Q&A: http://www.autodesk.com/discussion

    ======================
    Subject:
    Re: Linking door block attributes to door schedule
    Date:
    Wed, 20 Aug 2003 19:04:51 -0700
    From:
    Butler <>
    Newsgroups:
    autodesk.autocad.customization.vba


    The schedule is a seperate drawing that has titles across the top
    like material, glass, undercut, etc., and door numbers across the
    left side. It is a templete that I created so it is the same for
    all jobs. Right now it is blocks but I'm going to make it an
    attributes, I just want to know what I need to do to link the two
    seperate drawings. Attached a empty door schedule, and my current
    block for a door. One other thing I have created a library and a
    drop down menu with different wall thickness... A lot of work but
    I LOVE A GOOD CHALLANGE :)

    File: 90door4875.dwg
     
    Anne Brown, Aug 21, 2003
    #4
Ask a Question

Want to reply to this thread or ask your own question?

You'll need to choose a username for the site, which only take a couple of moments (here). After that, you can post your question and our members will help you out.