Hello, I am in need of a way to automate assura DRC jobs. I need to run several rule sets (DRC, Stress, Density, LUP, ESD, etc.) on some fairly large designs. Each of these can take a very long time and it would be great to kick off some skill code and come back 12 hours later to the finished log files. Does anyone have any sugestions? Can this be done? Best, Lou