I was messing around with 2001 and 2000i. In 2001 i see there is a new way to handle merged parts, such as a forging and a machined part from forging. Is there a difference between the two methods? In 2000i we created a "dummy" assembly containing the machined part, bacically just default planes and a forging model and preformed the merge process. In 2001, it does not appear that you have to create the "dummy" assembly. But you still have that functionallity if you want to do it that "old" way.

What are the differences between the old way and the new way?

Thanks
Leo
 
Try the Inheritence Feature (Data Sharing/Inheritennce), this may be a better solution than merge parts. Works great for castings and the like.

Steve
 
Hello Leo,

The key differences are:

1) No assembly model is required for the new 'Merge' or 'Cut Out' functionality. Although you can still perform these same two operations in Assembly mode if you prefer to do it that way--as you pointed out.

2) The new 'Merge' and 'Cut Out' functionality available through Part mode has a limitation regarding the 'placement' of the external reference object. With this new methodology, you can only use datum coordinate system features to constrain/place your external reference object. At least it's that way in the build of 2001 that I'm running now. I'd like to see PTC offer the user the same types of placement constraint options that are available when creating Pro/SHEETMETAL 'Form' features--or all of the regular Assembly mode placement constraints.

Ron

Leo Weeks wrote:
I was messing around with 2001 and 2000i. In 2001 i see there is a new
way
to handle merged parts, such as a forging and a machined part from
forging.
Is there a difference between the two methods? In 2000i we created a "dummy" assembly containing the machined part, bacically just default
planes
and a forging model and preformed the merge process. In 2001, it does
not
appear that you have to create the "dummy" assembly. But you still
have
that functionallity if you want to do it that "old" way.

What are the differences between the old way and the new way?

Thanks
Leo
 